In October 2000 the Polish airport authorities called an international competition for the extension and remodelling of the international airport “Fryderyk Chopin” in the capital, Warsaw. Several big international teams specialised in the design of terminal buildings were invited. They were architectural practices like the Spanish Estudio Lamela, the French Paul Andreu (ADP), the German Von Gerkan (GMP), the American HNTB together with construction companies like Ferrovial, Bouygues, Skanska, Hoctief, Strabag, etc.
The first part of the competition took place in February 2001. In July 2001 there was a second part. As a result of this, there were a number of teams in invited to participate in a second phase of the competition. The groups Strabag, Hochtief and the partnership of Budimex, Ferrovial and Estudio Lamela were classified. This final phase was delivered in April 2002.
In June of the same year the design project submitted by Estudio Lamela won the competition.
During the different stages of the competition and for the definition and carrying out of the architectural concept, Estudio Lamela collaborated among others with Ferrovial (construction and technical office), Budimex (construction), Budimex Prijekt (local engineering), Sener (airport planning and special systems), Buro Happold (façades and roofs), 2ª2 (landscaping).
At the moment, once the development of the Concept Project has been finished, the works of the Proyekt Budowlany (project in order to apply for the planning permission) will be carried out in the offices that Lamela Asociados have in Warsow.
In order to carry out such project, Estudio Lamela has subcontracted a team of Polish architects called Studio Quadra. Other subcontracted collaborators are the following:
Structures: SDZ Projekt
Mechanic and electrical services: Pol-Con
Façades: Biuro Techniczne Tuscher
Roads: AKA
Urban development and landscaping: RSArchitektura
Fire Protection: Protect
Health and Safety at work: BHP Andrzej Magdziarz
Hygienic conditions: Sanepid, Halina Nowak-Nejno
Design criteria
The design criteria, which have been considered as the base for the conception of the architectural project, have been the following:
Flexibility, thanks to the creation of a system which allows the modular growth of the homogeneous areas, according to the needs of the growing air traffic. This applies both to the architectural functionality and the structures and services.
The airport due to its typology and structural shape forms a flexible development, which can be easily adjusted. The pier, the check-in and departures/arrivals area have been designed to undergo any type of configuration in the medium-long term (like the increase of Schëngen flights due to the joining of Poland into the UE, or the increase of the security measures in air traffic, for example).
Space clarity, using as reference such elements as the opening of penetrations over the big spaces and the entrance of natural light in all the main user areas, including the baggage reclaim hall. The comfort of the passenger is one of the most important aspects when designing an airport. The feeling of security and spaciousness are related to the abundance of ample and transparent spaces. The New Terminal Building in Warsow will have the main façades glazed, providing views to the exterior from all the areas of the Terminal. In this way, the passengers will always enjoy the natural light and even the interior of the building will be provided with transparency. In the double height of the pier, the airbridges for arrivals and transfers will also be glazed, floating in the space like free pieces providing spectacular views over the interior of the terminal to the passengers.
Simplicity of distances and connections for the passenger flows.
The solution proposed wants to be simple, first of all. Simple for the passenger who will be able to orientate himself without any problem. Simple for the airport employees who will see how the surfaces are extended. Simple for the visitors, who will access to the Terminal without any problem through a road system without interferences. Moreover, the proposal has been conceived in order to be functional, without the unnecessary loss of space and to exploit to the full all the available surfaces of the extension.
Functional, architectural and aesthetic considerations
The New Terminal Building will be the gateway to the country and an indispensable piece of infrastructure during the next years. Ample, very high and transparent spaces, which are visually connected to each other, will be shaped, and covered by an inclined roof which will have a dramatic impact. The proposal draws inspiration from XXI century architecture, as it is contemporaneous in the materials and the concepts it uses, of a big visual impact, appropriate to the image of a new Poland in the world.
The proposal backs the future integration of the existing terminal (T1) with the new terminal (T2) of approximately 100,000 m2, which together with the new pier of 725 ml and a capacity for 34 assisted stands for aircrafts, will form a unique space conceived for HUB operations –links for multiple connections- strategic centre of the air traffic in Central and Eastern Europe, with a future total capacity of 12,5 million passengers per year.
The system of the project is based on the concept of maximum flexibility and modularity which give the terminal a powerful image and allows for possible adaptations and extensions without altering significantly its configuration and make easy the adjustment to present and future needs.
The roof and the façade, light and elegant in shape ample in size and with its distinctive high spaces, which give the building a spacious quality.
The floors have been designed to allow very functional passenger flows, creating a sequence of warm, transparent spaces that are connected with each other and with an exterior which allows the entrance and all areas to be flooded with natural light and furthermore the building makes for the simplicity of passenger flows and orientation crucial in a modern airport.
Additionally, the project of Estudio Lamela also takes into account developments on the landside, which include new accesses and car-parks for more than 5500 vehicles, etc.
Scope of the works planned in stage 1
– Carrying out of Terminal 2 and its infrastructure.
– Demolition of existing buildings on the landside and adaptation of the infrastructure networks currently in use.
– Extension and modernisation of the apron (airside).
– Car-parks for passengers in height and surface, bus station and taxis.
– Construction of the VIP sector with two assisted parking spaces.
The New Terminal
Within the arrivals section, the spectacular nature of the space in the check-in spine hall is enhanced by making the passengers pass through the communication corridors adjacent to this space. We have made every effort to enhance the value of the natural lighting in all those public spaces.
The new Terminal 2 will have a capacity for 6,5 million passengers per year and together with Terminal 1, in a second construction phase, the group of terminals will be have the capacity for 12,5 million passengers/year. The purpose is to build an airport HUB type according to the standards B of IATA.
All levels of the T2 will be connected with the corresponding levels of the T1, in order to use rationally the available surfaces. On the other hand, the operative effectiveness of the existing Terminal 1 during all the sub-phases of construction of the Terminal 2 will be guaranteed.
The structural system selected is modular and therefore allows simple adaptations and extensions as well as simplifying the construction phase. This concept is essential in the design of the contemporary airports and is connected with its flexibility. The module which has been selected as a base is the structural one located in the T1 (9.60 x 9.60) in order to unify it with the structure of the new terminal. This module is equal to 19,2 x 19,2 in the main public areas for passengers.
The principles of functionality and maximum exploitation are also reflected in the design of the roads system on the landside, which uses many of the existing highway infrastructures. Maximum cost-effectiveness has also been sought. The centre of the New Terminal Building has a large retail area, planned according to the most modern exploitation criteria.